Location:
Pembroke Power Station / RWE, Pembroke Net Zero Centre
Overview
RWE is the operator of the UK’s largest, and already one of the most efficient, combined cycle gas turbine (CCGT) plant (Pembroke Power Station), and are developing a breadth of energy transition projects across its Pembroke Net Zero Centre.
Development on this site will support the construction of facilities and infrastructure including a proposed carbon capture plant, a large battery storage project, and industrial-scale green hydrogen production.
Land profile
- 86.4 Hectares
- Brownfield Site
- Site surrounds the operational Pembroke Power Station.
Existing Energy Infrastructure
- 2181 MW EXISTING CCGT plant
- Existing electricity grid connection to both 400kV and 132kV, with additional connections secured
- Dedicated connection to the national gas network
Key Sectors
- Ongoing requirement for providing security of supply to the UK
- CCS development with liquid CO2 shipping (non-pipeline transport)
- Hydrogen production
- Battery Storage
- Grid Stability
- Innovation Hub and industrial cluster integration
Port of Milford Haven Tax Site Landowners
Be a part of Celtic Freeport’s future
Stay informed about the latest news, developments, and opportunities from the Celtic Freeport and our partners by signing up for our email newsletter.